The following videos demonstrate the step by step process of installing an ATDynamics Dry Van TrailerTail®:
INTRO: TrailerTail Installation
STEP 1: Setting Up the Template
STEP 2: Placing the Elevator Bolts
STEP 3: Installing the Swingarm
STEP 4: Installing the Lateral Panel
STEP 5: Installing the Top Panel
STEP 6: Installing the Bottom Panel
STEP 7: Final Adjustments
Note: These videos only provide an overview for installing a Dry Van TrailerTail®.
Please download and reference the TrailerTail® DryVan or Reefer Installation Manual before installing:
Be sure to read our frequently asked questions prior to installation: F A Q
Need assistance, spare parts, a printed copy of the manual or DVD copy of the install video?
Call us at 1-888-ATD-TAIL (888-283-8245), email us at: support@atdynamics.com
INTRO: TRAILERTAIL INSTALLATION
STEP 1: SETTING UP THE TEMPLATE
STEP 2: PLACING THE ELEVATOR BOLTS
STEP 3: INSALLING THE SWINGARM
STEP 4: INSTALLING THE LATERAL PANEL
STEP 5: INSTALLING THE LATERAL PANEL
STEP 6: INSTALLING THE TOP PANEL
Questions / Comments? Call us at 1-888-ATD-TAIL (888-283-8245), email us at: support@atdynamics.com